Is It Too Late to Start On My Local Law 87 Compliance for 2019?

Before there was a Green New Deal in New York City, there was Local Law 87, which requires an energy audit and retro-commissioning report to be conducted and filed every 10 years. Yes, it still applies, and yes it will help you to understand the most cost-effective retrofits and upgrades to target for compliance with the city’s new energy efficiency requirements. Thanks for asking!

The question we get most this time of year from owners in NYC is, “My building is due for LL87 compliance this year, is it too late to start?!”

Image of Commercial BuildingsAs spring arrives, building owners often realize that time is quickly running out and this is the year that they must submit their building. Compliance with NYC’s LL87 (Local Law 87) can be overwhelming and hard to navigate but we are here to help.

Not sure if you have to file?  Check here.

LL87 requires that a building undergo an energy audit and retro-commissioning of major mechanical equipment. Keep in mind that it takes time to perform the inspections and testing. In fact, your best bet is to start in the year before your deadline, leaving yourself plenty of time for planning, budgeting, and implementing any corrections that may be required.

(more…)

Here’s What the Clean Energy DC Act Means for Existing Buildings in the District

Mayor signing legislationDistrict of Columbia Mayor, Muriel Bowser, signed a landmark piece of legislation known as the Clean Energy DC Omnibus Amendment Act this past Friday. With the mayor’s signing, Washington, DC becomes one of the first jurisdictions in the country with a binding, comprehensive law aimed at reducing greenhouse gas emissions. “It allows us to make significant improvements to the energy efficiency of existing buildings in the District,” Mayor Bowser said at the signing ceremony.

The new law has several sections which will impact the buildings in which DC residents and businesses live and work. In this post, we’re going to focus on Title III of the Clean Energy Omnibus Amendment Act, which is designed to make the city’s existing buildings more efficient.

(more…)

The Top 10 Party Walls Posts of 2018!

2018 has been a year to remember for SWA’s Party Walls blog. Our consultants have shared their passion for high performance buildings by recounting stories from the field and providing information, new findings, and best practices to improve the built environment.

Whether discussing topics based in New York City or Southeast Asia, here are our fan favorites from 2018…

Collage of blog images

(more…)

Looking for a Fast Payback by Installing a Dedicated Domestic Hot Water System? You May Want to Look Elsewhere

Installing a dedicated domestic hot water (DHW) plant is a common energy conservation measure (ECM) in the New York City multifamily market. According to Local Law 87 data, approximately 80% of the audited multifamily floor area uses steam heating boilers to produce domestic hot water.[1] A recent SWA analysis of data from steam buildings with tankless coils that implemented this ECM suggests that auditors may want to think twice about recommending this measure widely.

Two unsupported arguments are typically made in favor of installing a dedicated DHW system.

  1. A new condensing boiler or water heater (we will just say “water heater” here for simplicity and to distinguish the dedicated system from the heating boiler) will operate at a very high efficiency.
  2. Scotch marine steam boilers are inherently inefficient and are plagued with high standby losses. Large Scotch marine boilers fire to meet small DHW loads, and correctly sizing a new dedicated water heater will eliminate short cycling.

(more…)

Over Pressure (Part Two)

Welcome back! In Part One we talked about how steam pressure gets too much attention. Controlling pressure for its own sake should never be the end goal—steam pressure is just a means to an end. In this post we’ll discuss one way that controlling steam pressure can be useful—where it can help you balance the system, control the temperature, and yes, save energy.

Two-pipe Steam

The biggest issue plaguing two-pipe steam heating systems are steam traps. Steam traps are supposed to do just that—trap steam—keeping the pressurized steam on the supply side of the system and allowing air and water (i.e., condensate) to pass through into the returns. Keeping the supplies and returns separate is critical, but steam traps are too failure prone to accomplish this reliably.

Radiator steam “trap” failed open

Radiator steam “trap” failed open

At the start of any heating cycle, the system is full of air, which must be removed for steam to enter the heaters. In most two-pipe systems, the steam pushes the air out of the heaters, through the traps, and into the return piping where it eventually exits the system through a vent in a vacuum or condensate tank. That’s what happens when the traps are working. But a failed open trap is no trap at all. It lets the steam flow into the return piping and, with pressure on both the supply and return sides, air is trapped in the system. This affects those farthest from the boiler—the heaters near the ends of the mains and on the top floors—the most.  (And with air trapped inside keeping the metal cold, are they even heaters?)

(more…)

Just Your Typical Blower Door Test… in Sri Lanka – Star Garment Innovation Center

As the number of projects pursuing Passive House certification increases, so does the demand for whole building blower door tests. And so, performance of recent blower door tests took us to uncharted territory, not only for SWA, but for the Passive House Standard.

Rendering of Star Garment Facility

 

Working remotely with a project team across the globe, the Passive House team at SWA was tasked with retrofitting an outdated factory in Katunayake, Sri Lanka, into a Passive House certified garment manufacturing facility. Jordan Parnass Digital Architecture (JPDA) recruited SWA to provide technical assistance to the project team. Responsibilities for this project included Passive House design analysis and recommendations, mechanical design review, energy and thermal bridging modeling, and the testing and verification necessary to achieve certification from the Passive House Institute (PHI).

(more…)

Foundation Waterproofing – Proper Installation and What NOT to do!

As mentioned in Foundation Waterproofing 101, water damage to a foundation can be very costly and difficult to repair. By paying close attention to how and where water might enter the foundation during the early stages of construction, typical failures can be avoided by following these simple guidelines…

For the Designer: Keys to proper installation

Design and Quality Assurance

  • Don’t wait to design the foundation waterproofing system after you’re already in the ground!
  • Specify and detail the appropriate system for each project. Meet with manufacturer reps early!
  • Require shop drawings and kickoff meetings to ensure the entire team understands the importance of the design! Review examples of common failures.
  • Get your consultants on board early: Geotechnical engineer, Structural engineer, Waterproofing/enclosure consultant.
  • Review warranties, require third party inspections, installer certification, and contractor training.

For the Installer: Keys to proper installation

Substrate preparation

  • Provide smooth continuous surfaces to install waterproofing – minimize jogs, protrusions, and sharp edges.
  • At slabs: compacted fill/rigid insulation board/rat slabs
  • At walls: fill bugholes, remove/grind concrete fins, mortar snots, fill form tie holes, verify form release agents and compatibility.

(more…)

Trying to Be Rational in an Irrational World

Think about the last time you went looking for a new car. What did you look for? I am guessing you started with your needs for a vehicle. Are you looking for a large car/SUV to move a lot of people or equipment, a car for commuting to work, or something to enjoy on the weekends? Next you probably were interested in the looks of the vehicle because it is a large investment and you should like what you drive. I am guessing you glanced at the miles per gallon (mpg) of the car. You even likely went online to see reviews from others on the comfort, crash test rating, and typical maintenance issues of the car. Of course, you will need to look at the sticker price. I am even assuming you asked to test drive the vehicle to make sure that the information that you obtained aligns with how you perceive the vehicle.

Now, what if I told you that you must make that vehicle purchase decision only based on the dimensions of the car, the features (radio, A/C, seat controls, etc.) of the car, some pictures of the interior, and the price. Do you think you could decide on which car you would want? My guess is that you would say I am crazy and that you wouldn’t make the decision on such a pricey purchase with so little information. But, that is exactly what millions of people do when making a significantly more expensive purchase… a home.

(more…)

Multifamily Passive House Ventilation Design Part 2: HRV or ERV?

*click here to read Part 1 of this blog

In climates with significant heating and/or cooling seasons, Passive House projects must have a balanced heat or energy recovery ventilation system. These systems use a heat exchanger to transfer heat and moisture between the outgoing return and incoming outdoor airstreams. The operation of recovery ventilators reduces the energy required to heat and cool decreasing the building’s carbon footprint. Project teams can select either:

  • Heat Recovery Ventilators (HRV) that transfer heat from the return air stream to the outside air stream; or,
  • Energy Recovery Ventilators (ERV) that transfer heat and moisture from the return air stream to the outside air stream.

Deciding between an HRV and an ERV gets more complex when the Passive House concept is scaled from a single-family home to a multifamily program. What the industry has learned from the development of airtight buildings and programs such as Passive House and R2000, is that indoor relative humidity must be controlled through continuous ventilation. The extremely air tight building envelope required of a Passive House, combined with high internal moisture gains from an occupant dense multifamily program (coming from occupants, kitchens and bathrooms), forces additional moisture management considerations during mechanical ventilation design. Maintaining acceptable interior relative humidity in both the heating and cooling season is paramount for building durability and occupant comfort. It’s appropriate that Passive House professionals claim this simple motto: “Build tight, ventilate right!”

In New York City where the multifamily Passive House market is rapidly growing, there is a significant heating season and a demanding cooling season with high humidity (Climate Zone 4A). With this seasonal variation, there are four primary operating scenarios for an HRV or ERV that need to be considered during design:

Summer Condition – HRV

An HRV operating in the summer (hot-humid exterior air and cool-dry interior air) introduces additional moisture to the building through ventilation. Heat is transferred from the incoming outside airstream to the return airstream leaving the building which cools supply air, but exterior moisture is not removed from the incoming air. The building’s dehumidification load increases as a consequence of additional moisture from the outdoor air.*CON*

HRV Summer operation (more…)

Multifamily Passive House Ventilation Design Part 1: Unitized or Centralized HRV/ERV?

*click here to read Part 2 of this blog

Project teams pursuing Passive House frequently ask, “Where do we locate the HRV/ERV?” The answer is complex when the Passive House concept is scaled to a multifamily program.  While there are two primary arrangements for HRV/ERV systems, the trade-off is dynamic and needs to be carefully considered as multifamily Passive House projects begin to scale. A low volume HRV/ERV unit ventilating an individual apartment is a unitized HRV/ERV. High volume HRV/ERV units ventilating multiple apartments and often servicing several floors, is referred to as centralized HRV/ERV.

As Passive House consultants we can attempt to address the system arrangement question with building science; however, in New York City rentable floor space is very valuable, so considering the floor area trade-off is of particular interest to project teams. When a unitized HRV/ERV system cannot be located in a drop-ceiling due to low floor-to-floor height, it is placed in a dedicated mechanical closet. This closet is typically no smaller than 10 ft2 and includes the necessary ductwork connections to the HRV/ERV unit. The alternative solution is to increase the floor-to-floor height to accommodate the HRV/ERV unit and horizontal duct runs in the ceiling. Centralized HRV/ERV systems, however, allow short horizontal duct runs but require floor space to accommodate vertical shafts. With supply and exhaust ducts coupled together the required floor area is about 8-12 ft2. As a result, centralized HRV/ERV systems may actually require more floor area than a unitized system.

Example: In the case of Cornell Tech, vertical supply and exhaust duct work for the centralized HRV/ERV system required 222.5 ft2 per floor, or 13 ft2 per apartment (see image 1 below). Unitized HRV/ERV mechanical closets would have required an estimated 170 ft2 per floor, or 10 ft2 per unit (image 2 on right).

Comparison images HRV/ERV

Image 1 & 2:  These images compare the amount of floor area required for centralized and unitized HRV/ERV systems. Image 1 on the left, shows the 12ft2 floor area required for vertical shafts servicing the centralized ERV at Cornell Tech. Image 2 on the right is hypothetical, showing the typical location and 10ft2 floor area required for a unitized HRV/ERV mechanical closet.

(more…)

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.