MENU

Party Walls

The 3 Most Important Design and Construction Considerations for Senior Living Facilities

Last year, a young New Zealand lawmaker shut down a fellow member of parliament who was heckling her climate change speech with two words: “OK, Boomer.” This simple phrase started an online wildfire and ignited a conversation about the generation known as “baby boomers.” Born just after World War II, this demographic represents a period of growth, hope, and prosperity. The building, real estate, and senior housing industry has been thinking about the boomer generation for a while now. Between the years 1946 and 1964, 76 million babies were born. Every day until 2030, 10,000 of these individuals will turn 65, which means they will likely be retiring, and eventually considering how and where they want to age. This poses the question: how are we going to meet the growing demand for housing and care for this population?

image of senior couple holding hands and walking

Important Considerations for Senior Living

Whether you or someone you love is considering staying in their home as they age or moving into a senior living facility, there are a few important factors to keep in mind. SWA services for senior living revolve around the following three factors:

(more…)

Choosing Insulation for Carbon Value – Why More is Not Always Better Part 2

In Part 1 of this blog post, we highlighted two of the most commonly used insulations in the U.S.– XPS board and closed-cell polyurethane spray foam – and noted that they are produced with blowing agents (HFC-based) that are putting more carbon into the air during construction than they save during building operation for many decades. We left you with a question: if we don’t use these insulations, how can we make up for the loss of the helpful qualities that has made us dependent on them?

Insulation Alternatives

One part of the answer comes from the development of new materials. In Europe over the last decade, Honeywell developed a new blowing agent, a hydro-fluoro olefin (HFO), which claims a global warming potential (GWP) of less than one, which is less than that of carbon dioxide.  First in Europe, and now in the U.S., manufacturers such as Demilec and Carlisle are coming to market with a closed-cell polyurethane spray foam that uses this blowing agent instead of the HFCs that carry a GWP of well over 1,000. These spray foams have a slightly better R-value  than their high-carbon predecessors, and otherwise have the same qualities that make them useful in multiple contexts – air/vapor barrier capability, conformance to irregularities and penetrations, etc.  However, they also have many of the same downsides – high flammability, potential (and not completely understood) off-gassing post-application, and the basic fact that they are petroleum products.

(more…)

Passive House: An Alternative Compliance Path to Toronto Green Standard Tier 3

It is clear to see that the Passive House (PH) standard is here to stay! Across North America, more States, Provinces, and Municipalities are integrating PH into their building standards. One of the more recent adopters is the City of Toronto. In the most recent version of the Toronto Green Standard (TGS), the PH standard is offered as an alternative compliance path to TGS Tier 3, and with this alternative compliance path one obvious question comes to mind: What is the major difference in required component efficiency for a multifamily building in Toronto that is looking to meet either the PH standard or TGS Tier 3?

The PH standard is performance-based and is focused on decreasing whole building energy demand, improving building durability, providing optimal occupant thermal comfort, improving indoor air quality, and reducing carbon emissions. The PH standard reduces building operation costs, decreases carbon emissions, and supports an improved indoor environmental quality for building occupants. The TGS has similar goals and benefits when compared to the PH standard, and there are some obvious synergies in the program design between TGS and PH. The tiered energy category in the TGS takes a similar approach to PH by offering an annual budget for three different categories. For PH you must comply with a total energy budget for annual heating demand, annual cooling demand, and total source energy use intensity. Similarly, but slightly differently, the TGS offers a budget for total site energy use intensity (TEUI), annual heating demand or Thermal Energy Demand Intensity (TEDI), and the additional category of Greenhouse Gas Intensity (GHGI). In both standards, the path to compliance is non-prescriptive and designers can implement a variety of component efficiencies and system options. See table 1 and 2 below:

 

Image of passive house criteria standards

Table 1: Passive House Standard Criteria

Second image of passive house criteria

Table 2: Toronto Green Standard Tier 3 Criteria

(more…)

The Making of the 2021 International Energy Conservation Code (IECC)

When I first started working at Steven Winter Associates, I didn’t know that one day I’d find myself involved in the development of codes and standards that impact how our buildings get built. I certainly don’t consider myself an expert, but I have learned a few things the hard way and thought they’d be worth sharing if you might be new to it.

So, here’s my very high-level summary of the code development process with respect to the 2021 International Energy Conservation Code (IECC), aka the “model” energy code. If you are looking for more detail, the ICC webpage has plenty of resources and a more detailed infographic than the one we’re showing and discussing here.

IECC Code Development Process Chart

 

 

(more…)

Whole Building Blower Door Testing – Big Buildings Passing the Test

The residential energy efficiency industry has been using blower door testing since the mid 1980’s to measure the air tightness of homes. Since then, we’ve evolved from testing single family homes, to testing entire apartment buildings. The Passive House standard requires whole-building testing, as will many local energy codes, along with assembly testing. While the concept of – taking a powerful fan, temporarily mounting it into the door frame of a building, and either pulling air out (depressurize) or pushing air into it (pressurize) – is the same for buildings both large and small, the execution is quite different for the latter.

Commonly called a whole-building blower door test, we use multiple blower doors to create a pressure difference on the exterior surfaces of the entire building. The amount of air moving through the fans is recorded in cubic feet per minute (CFM) along with the pressure difference from inside to out in pascals. Since the amount of air moving through the fans is equal to the amount of air moving through the gaps, cracks, and holes of the building’s enclosure, it is used to determine the buildings air tightness. Taking additional measurements at various pressure differences increases the measurement accuracy and is required in standards that govern infiltration testing. Larger buildings usually test at a higher-pressure difference and express the leakage rate as cubic feet per minute at 75 pascals or CFM75.

SWA staff at a project site setting up a blower door test

(more…)

Become a Carbon Hero with Five Easy Tactics

Before you can really dig deep into the advanced design concepts of embodied carbon analysis and whole building energy modeling, you must first perform some bare minimum prep work. An easy way to get the pre-schematic plan up on its legs quickly is to add qualitative performance measures to the architect’s program study or create an Owners Project Requirements (OPR) document. For this article, “qualitative performance measures” refer to the metrics that express embodied carbon, but can also include operational energy, water, and even healthy materials.

Integrated Design Process ImageAn integrated design process (IDP) anchors the architectural program to performance metrics such as carbon dioxide equivalents (CO2e), Energy Use Intensity (EUI), and zero Energy Performance Index (zEPI). So, by completing the IDP, you’re getting the basic tools to optimize embodied carbon and operational energy use in your design:

  1. Target the early phase of the project
  2. Prepare a Carbon Hotspot and Simple Box energy analysis to compare carbon sensitivity of different schemes not limited to wall and roof construction, massing, and solar exposure.
  3. Schedule a workshop with the design team and owner to discuss findings and recommendations.
  4. Establish performance targets such as total Carbon Dioxide equivalents as a basic program requirement.
  5. Choose a compliance pathway and verify design with Life Cycle Analysis and a Whole Building Energy model.

(more…)

Climate Week NYC: Seven Days of Climate Action and Discussion

 

Climate Week logoLast week, as I was writing this blog, I came across a New York Times article: “The Amazon, Siberia, Indonesia: a World of Fire.” By now, I’m sure most of us are aware that the Amazon Rainforest has been burning for weeks, but this deliberate act of environmental destruction will contribute to a feedback loop. These fires release carbon dioxide and kill the trees and species that not only remove greenhouse gasses from the air but are part of vital fragile ecosystems. As more climate-warming gasses fill the air, extreme weather patterns, drought, species loss, and global warming are exacerbated. These effects then accelerate the spread of infectious disease, global poverty, and human health defects. Overall, climate change and environmental degradation negatively affect both humans and the planet, which makes us less resilient and allows for climate change to accelerate even more aggressively. And the cycle continues.

So, for the sake of our (really wonderful) natural planet, and humankind, it is crucial that we try to hinder this feedback loop and make climate action a priority around the world. And, although individually we can try to have a more reciprocal relationship with the planet, our actions and voices carry more weight collectively, which is where Climate Week NYC comes in.

What is Climate Week NYC?

Organized by The Climate Group, Climate Week NYC is an annual week-long gathering for citizens and global leaders to join forces and take action to mitigate environmental harm caused by human activity. There will be a number of public events each day from September 23-29, including tours, film screenings, conferences, and more.

Fun fact: Swedish teenager and activist Greta Thunberg sailed across the Atlantic all the way from England to meet with UN Secretary-General Antonio Guterres, and to attend the United Nations Climate Action Summit, scheduled on the first day of Climate Week NYC!

(more…)

Electrify Everything? Part 2.

Heat Pump Water Heaters in Multifamily Buildings

In Electrify Everything? Part 1 that I wrote several months ago, I mentioned that integrated tank heat pump water heaters (HPWHs) can work well in single family homes — even in colder climates. For example, we see quite a few installed successfully in basements in the Northeast. These devices remove heat from the surrounding air, so there needs to be enough heat in the basement air for them to work effectively. During the winter, a home’s space heating system probably needs to work harder to make up for the HPWH. In the summer, the HPWH provides a bit of extra cooling and dehumidification. We put together some guidelines a few years ago on how to get the most from these systems in single family homes.

Image of heat pump

Some places where I’ve seen problems:

  •   Installing a HPWH in a basement closet. Even if a closet has louvered doors, there’s not enough heat/air for a HPWH to work well.
  • HPWHs are relatively loud. If there’s a finished part of the basement (e.g., bedroom or office), the noise can be disruptive.
  • Sometimes there is trivial heat gain to the basement (from outdoors, mechanical equipment, etc.). When a HPWH removes heat from the air, such a basement can quickly become too cold for the water heater to work efficiently (and too cold for comfort if someone uses the basement).

But overall, HPWHs in single family basements can work effectively.

(more…)

It’s Time to Focus on Our Schools

If you are a parent like me, I am sure you cherish your kids and seek to offer them the best opportunities in life. I even moved to a different school district. And, while the education is top-notch in my town, I have come to realize that it really doesn’t matter what school district you are in…all our schools need help. I am not talking about smaller class sizes, better pay for teachers, after-school programs, and more school supplies, although those are important. School buildings need attention. With budgetary pressures, a lot of maintenance and repairs are being deferred and schools are not aging well. Whether it is repairing existing systems, replacing systems at the end of their useful life, renovating, or building a brand-new school to service your community for future generations, advocate for your Board of Education (BoE) to think holistically about improving the conditions for our children.

Why My Call to Action?

This year I was asked to join our elementary school’s Tools for Schools committee, which is tasked with implementing an indoor air quality (IAQ) management plan. This experience gave me an opportunity to get involved and provided me insight into the school’s systems and the operations and maintenance (O&M) processes that were in place.

Unfortunately, at the start of the 2018 school year, mold issues were identified in our local middle school and the building was closed. In fairness, I quickly realized that buildings were outside the BoE members’ knowledge base. Afterall, they are educators, not facility managers or building scientists. They sought outside consultants but didn’t know the right questions to ask. After some time, the BoE decided to get input from local experts in the community. Fortunately, we have several experts (including me) who were willing to volunteer their time. As part of a task force, we laid out a strategy to remediate the mold issues in the school and to implement short- and long-term repairs to minimize/eliminate water incursion and elevated moisture issues within the building.

I am not saying you must get involved at this level, but I do encourage you to attend a BoE meeting and start asking questions related to IAQ. Ask if the school has deferred maintenance needs and if/when these are being addressed in the annual budget. Ask when (if) comprehensive physical needs assessments and energy audits were performed on all school buildings. Educate yourselves; then help educate your BoE and your community on IAQ guidelines for schools. Here are some great resources:

How Can SWA Help?

In working with schools, I have learned that one of the greatest challenges school decision-makers face is not knowing where to turn for support and guidance. Steven Winter Associates, Inc. (SWA) has been working to improve educational facilities for decades. Whether you have questions related to mold, moisture, comfort, absenteeism, accessibility, high utility bills…on up to zero energy design and progressive learning environments, SWA can support you. Here is just a sample of past school projects that SWA has worked on:

(more…)

Five Steps to Get Started with Net Zero Energy Buildings

Net zero buildings are becoming increasingly mainstream, with many jurisdictions adopting policies to move towards net zero new construction codes. A good overview of advanced energy codes is available on the Getting to Zero Forum, which includes a snapshot of activity around the country including Washington, DC, New York and Massachusetts.

What Does it Mean to be Net Zero?

The term “net zero” commonly refers to zero-energy buildings. In simple terms, a zero-energy building is one that produces as much energy as it consumes on an annual basis. There can be nuances and caveats to this definition, but for now, we want to bring you up to speed on five key net zero energy strategies to consider if you’re interested in developing a net zero building.

1. Maximize space for on-site renewable energy.

How tall is your building?

  • Any building over five stories will be challenging, if not impossible, to achieve net zero with on-site renewable energy production alone because building energy demand will likely exceed available site area. Maximize your solar with a smart layout and consider if other renewables, such as geothermal, are possible.
Image of roof layout

Typical roof layout for multifamily building, including necessary setbacks for fire access, mechanical equipment access, and shading from bulkheads. Fire access is based on FDNY guidelines.

Do you have other spaces available for solar photovoltaics (PV)?

  • Your development may have a separate parking garage or parking lot on site. These are great places to install a PV system, which can significantly increase the amount of on-site renewable energy production and help make achieving net zero more of a reality.

Do I have to have all renewables on-site to be net zero?

  • If you don’t have enough room for on-site renewables, you can look into purchasing off-site renewable energy options, such as community solar, power purchase agreements, or renewable energy credits.

Now that you’ve considered renewables, let’s move on to net zero building design considerations.

(more…)

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.