MENU

Party Walls

20 Years of Wintergreen!

A lot has happened since the start of the WinterGreen newsletter, which was first distributed 20 years ago via fax machine. From the inception of LEED, to the Climate Mobilization Act, WinterGreen has covered it all.

In honor of its anniversary, we are looking back at the milestones that occurred along the way and making predictions for the future…WinterGreen Banner circa 1999

1999 – Steven Winter Becomes Chairman of the US Green Building Council

Image of Steven Winter as USGBC ChairmanAs Chairman of the U.S. Green Building Council from 1999 to 2003, Steven Winter helped guide the organization through a period of immense growth. This included the launch of Leadership in Energy and Environmental Design, also known as the LEED® Rating System, and Greenbuild, the nation’s largest green building conference and expo.

 

2000 – SWA Receives NYSERDA Pioneer Award

Image of Steven Winter with NYSERDA AwardAt a gala event celebrating the 25th anniversary of the New York State Energy Research and Development Authority (NYSERDA), Steven Winter Associates (SWA) was presented with the NYSERDA Pioneer Award for their extensive contributions to making buildings more energy efficient and sustainable.

 

2001 – Green Building Guidelines Book Published for Home Builders

Image of Green Building Guidelines bookIn conjunction with the U.S. Department of Energy (DOE), the National Renewable Energy Lab (NREL), and the Sustainable Buildings Industry Council (SBIC), SWA staff collaborated to create “Green Building Guidelines: Meeting the Demand for Low-Energy, Resource-Efficient Homes.” The book provided green building techniques and strategies for home builders and residential construction professionals.

 

2002 – SWA Helps DEC Become New York State’s First Ever LEED Certified Building

Image of New York DEC Headquarters in AlbanyWorking with NYSERDA, Picotte Companies and WCGS Architects, SWA provided certification support to the design team, earning the project LEED V2.0 Silver. SWA’s services included initial LEED tabulations and goal setting, detailed LEED V2.0 evaluation reporting, and completion of the final documentation package, which led to the certification of New York State’s first ever LEED building.

 

2003 – The Solaire Declared Nation’s First “Green” Residential High-rise

Image of The SolaireNew York Governor George Pataki dedicated The Solaire as the country’s first “green” residential high-rise building, calling it “a benchmark for urban sustainable development and for green buildings worldwide.” SWA supported the design team on this project from conceptual design phase through construction administration. The Solaire, located in New York’s Battery Park City, was the first residential building to be completed in downtown Manhattan after the terrorist attacks of September 2001, and was the first beneficiary of Governor Pataki’s green building tax credit.

 

2004 – SWA Joins Project Team for Oculus Terminal at World Trade Center

Image of World Trade Center PATH TerminalLed by the joint venture of DMJM+Harris and STV, as well as the internationally renowned architect, Santiago Calatrava, SWA was invited to join the project team to provide energy efficiency and sustainable design consulting services for the new World Trade Center station, also known as the the Oculus. The rebuilt PATH terminal is incorporated into the design.

 

2005 – USGBC Announces LEED for Homes Pilot Program

Image of home under constructionExcited to announce the first ever LEED program for residential construction, the USGBC immediately began seeking applicants to test the effectiveness of the all new LEED for Homes through a Pilot Program. LEED for Homes, which is considered a green building milestone, was made possible by a passionate committee of industry professionals co-chaired by Steven Winter.

(more…)

LEED v4.1 O+M is All-In!

Are you in? The US Green Building Council (USGBC) wants you to be. The “All-in” campaign has just officially expanded to include the new and highly anticipated LEED v4.1 for Building Operations and Maintenance (O+M).

Full disclosure: As a member of the Energy and Atmosphere (EA) Technical Advisory Group, I was involved in reviewing LEED v4.1 modifications. In the past, LEED had set significant barriers to entry for existing buildings. For example, LEED O+M EA Prerequisite Minimum Energy Performance set a baseline ENERGY STAR score of 75, which restricted certification to the top 25% of efficient buildings. This limitation often caused building owners to abandon LEED before even getting started, thus eliminating a key incentive for improving underperforming buildings’ environmental impact. LEED 4.1 has fixed this problem. The restrictive prerequisite for energy performance has been replaced with a voluntary credit, encouraging building owners to benchmark energy use and screen capital improvements against energy impacts.

The newest version of LEED O+M also incorporates Arc, USGBC’s performance tracking platform. In Version 4.1, the energy score is calculated based on two energy metrics:

  1. LEED v4 ImageThe traditional ENERGY STAR metric of annual Source Energy Use Intensity (kBtu/sf);
  2. The Arc metric of Annual Greenhouse Gas Emissions Intensity (GHG/person).

(more…)

Don’t Be Scared of LEED v4

LEED v4 Changes and Updates

leedv4picleedarticleghostpicWe all knew the time was creeping up on us when LEED v2009, known as LEED v3,would no longer be an option. There are plenty of Halloween ghouls about, but LEED v4 shouldn’t give you a scare! We have a few key resources to help you understand the new rating systems and ensure a smooth transition.

LEED v3 Sunset and Registration Dates

All projects that wish to pursue LEED v3 must register  by October 31, 2016. Additionally, LEED v3 projects must certify by June 30, 2021. Projects that register now under LEED v3 can always transition to LEED v4 at no cost, but you can’t switch back to v3 after 10/31/16.

(more…)

Transitioning to LEEDv4

LEED v4 transition

Written by Anna Speed, SWA Sustainability Consultant

After 61% of those surveyed at Greenbuild 2014 replied that that they were not prepared, or were unsure if they were prepared for the inception of LEED® version 4 (v4), the United States Green Building Council (USGBC) announced that it would allow LEED users to register projects under the LEED version 3 (v3) rating system until October 31, 2016. The original date for LEEDv3 registration to close was June 27, 2015. The USGBC made their decision to extend the deadline based on their understanding that LEED users and members needed additional time to prepare for v4, which is more stringent and requires greater cooperation from manufacturers and suppliers.

As a result of the extended deadline, the USGBC offers projects the ability to pursue LEEDv4 credits while registered under the LEEDv3 rating system. One credit for example is Materials and Resources Pilot Alternative Compliance Path 84 where project teams can pursue the entire LEEDv4 Materials and Resources (MR) Category in place of the MR credits from LEEDv3. This includes Storage and Collection of Recyclables, Construction and Demolition Waste Management Planning, Building Life-Cycle Impact Reduction, Building Product Disclosure and Optimization (Environmental Product Declarations, Sourcing of Raw Materials and Material Ingredients), and Construction and Demolition Waste Management. (more…)

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.