MENU

We Should Know Better: Top 10 Multifamily Design Mistakes with Steve Klocke, Part 1

The residential building industry has made incredible progress toward sustainability and energy efficiency goals. At the same time, Senior Sustainability Consultant and Registered Architect Steve Klocke finds many new buildings under-performing because designers continue to make simple, avoidable mistakes.

Based on lessons he’s learned from certifying over 1,200 dwelling units over the past seven years, Steve discusses the top ten multifamily design mistakes being made over and over again – and how to avoid them.

(more…)

Tech Notes: Accessible Parking in Precast Garages

exterior of parking garageWhen designing accessible parking spaces, it is important to remember that the slope of the ground surface for the entire parking space and adjacent access aisle must not exceed 2% in any direction. We frequently see noncompliant slopes at accessible spaces, especially when the ground surface is asphalt or permeable pavers.  The slope along the perimeter of spaces at curbs or gutters is frequently more than 2% at up to 5%, which requires careful detailing and planning on the part of the architect, civil engineer, and on site contractors to ensure that a compliant slope is achieved at the accessible parking spaces. At parking structures and precast garage systems, we have found that important details and coordination needed to achieve compliant ground surface slopes are often overlooked.

 

design plan drawing

Ground surface slopes at walls or parapets often exceed 2%, (blue highlight) resulting in noncompliant slopes at the heads of accessible parking spaces.

In parking structures, it is common for an area along the perimeter of the slab (adjacent to walls or parapets) to slope in excess of 2% for drainage purposes. In some cases, this slope is embedded into the precast system. As a result, accessible parking spaces must be located away from the sloped edges during the initial design phase.

In other cases, noncompliance results from the application of a cast in place (CIP) wash applied to the top of the precast slab. In the detail shown below, note the slope condition at the CIP topping. The wash is often indicated only in section details on the precast drawing set, making it easy to miss if designers are not specifically looking for how these details affect accessible parking spaces. The entire project team involved in the design and/or construction of the garage must be made aware of where accessible parking spaces are located and understand the specific slope requirements to ensure that details are properly coordinated.

design details drawing

The cast in place topping results in a slope of more than 2% at 8.33% at the head of the accessible parking space.

Once the garage is constructed, it is nearly impossible and very costly to fix noncompliant slopes at the head of accessible parking spaces. In some garages, we have been able to solve the problem by shifting the striping at accessible parking spaces. This results in the steeply sloped ground surface being located fully outside of the parking space and access aisle. The problem is that this solution is dependent upon whether the spaces can be shifted without compromising the minimum required width of the drive aisle or obstructing access to other parking spaces.

(more…)

Healthy & Sustainable Building Materials with Charley Stevenson, Part 2

The advancement of building materials has allowed professionals to achieve new heights when designing and constructing high-performance buildings. But, the topic of building materials is not discussed enough, and more consumers are asking important questions. How do we know where these materials come from? What effects do they have on human health and the environment? How are standards for responsible building materials being enforced? The list continues…

This two-part episode features an interview with Charley Stevenson, a sustainability consultant and green building entrepreneur who has devoted his career to helping others understand and implement healthier materials goals. The discussion begins with a look at the Living Building Challenge, a program that pays particular attention to healthy building materials, and continues with a review of some of the resources that are intended to help consumers learn more about materials and their make-up.

(more…)

Healthy & Sustainable Building Materials with Charley Stevenson, Part 1

The advancement of building materials has allowed professionals to achieve new heights when designing and constructing high-performance buildings. But, the topic of building materials is not discussed enough, and more consumers are asking important questions. How do we know where these materials come from? What effects do they have on human health and the environment? How are standards for responsible building materials being enforced? The list continues…

This two-part episode features an interview with Charley Stevenson, a sustainability consultant and green building entrepreneur who has devoted his career to helping others understand and implement healthier materials goals. The discussion begins with a look at the Living Building Challenge, a program that pays particular attention to healthy building materials, and continues with a review of some of the resources that are intended to help consumers learn more about materials and their make-up.

(more…)

The First Certified Passive House in Southeast Asia – Star Garments Innovation Center

Following up on our blog post in August 2018 – Just Your Typical Blower Door Test… in Sri Lanka – Star Garment Innovation Center – we have exciting news coming out of Sri Lanka. The Star Garments Innovation Center is now officially certified as a Pilot EnerPHit building, the building retrofit standard under the Passive House Institute (PHI).

EnerPHit logo with project details

EnerPHit certification for this project is a milestone achievement on many levels. The Innovation Center is now the first certified Passive House in Southeast Asia and one of only a handful of certified PH projects in tropical climates. PHI deemed the project “a milestone in industrial energy efficient retrofitting in a tropical monsoon climate.” Many of the passive measures employed at the Innovation Center, including continuous exterior insulation, highly efficienct windows, variable refrigerant flow heat pumps for cooling with wrap around heat pipe for enhanced dehumidification capacity, and balanced ventilation with heat recovery can be utilized across all future construction projects in tropical climates. The Passive House team here at SWA is excited to see the potential growth in tropical-climate Passive House construction as a result of the Innovation Center’s success.

But what good is certification if the building doesn’t perform as well as the energy model predicts? Well, we have exciting news on this front too!

At the very start of SWA’s involvement in the project back in the summer of 2016, SWA conducted a utility analysis of the base building prior to any renovations to predict and later verify the energy savings of the Innovation Center by designing to the PH standard. Once the energy model was developed, SWA predicted approximately 50% in energy savings when compared to the previous building’s energy bills.

Fast forward to Fall of 2018 and the building has now been occupied for a full year. The two inevitable questions are:

  1. How much energy is the Innovation Center saving as compared to the previous building?
  2. How does the modeled energy use for the Innovation Center compare to what it is actually using after a full year of occupancy?

(more…)

The Importance of Climate Policy in Cities with Laurie Kerr

As we enter a new era of climate policy, we wanted to evaluate some of the efforts major cities have made along the way. How do cities compare? What improvements have they made? And where should cities start with regards to climate action?

To help us answer these questions, we called upon Laurie Kerr, a climate policy veteran who helped shape the sustainability plan of one of the most notable cities in the world with regards to climate change and climate action – New York City. Laurie discusses which programs were successful (and which were not) during her time with the Bloomberg administration, and compares these initiatives to those of different cities around the US.

(more…)

Developing Boston’s Tallest Passive House with Brad Mahoney

As we continue our discussions around high-performance buildings, we would be remiss if we did not discuss the laudable endeavor that is MP Boston’s Winthrop Square. Projected to be the fourth tallest building in Boston and the largest Passive House office space in the world, Winthrop Square is a pinnacle of high-performance design.

Although construction for this project has just begun, we were eager to hear about the plans for this immense undertaking. So, we sat down with MP Boston’s Director of Sustainable Development, Brad Mahoney. Brad shares some of the extraordinary energy conservation measures that will be included in the tower and highlights the many benefits that the project is anticipated to achieve, including advanced productivity, wellness, and social engagement.

(more…)

Environments for Aging: Designing Better Senior Housing

entry way of conference with attendees walking in

The 2019 Environments for Aging Conference took place last month in Salt Lake City, UT.

Last month, I had the opportunity to attend the Environments for Aging conference in Salt Lake City. Hundreds of professionals involved in the complex world of senior living gathered to learn from each other and to explore products and services that are designed for the senior population. It was not surprising to see the level of interest in the event; according to the US Census Bureau, 20 percent of the current US population will be 65 or older by 2029. The Baby Boomer generation, which accounts for the majority of that 20 percent, is moving into their 70s and are beginning to consider how and where they want to age. Some Boomers prefer to remain in their current homes in the communities that they helped build. Others want to move into smaller homes or prefer to transition to senior living communities. Many of these senior living communities are popping up both in suburbia and active urban centers in response to the current trend in senior housing preferences.

There are many senior housing typologies: among the most common are independent living, assisted living, and dementia care. Each type of living arrangement has specific needs that must be addressed from a design perspective.

(more…)

Is It Too Late to Start On My Local Law 87 Compliance for 2019?

Before there was a Green New Deal in New York City, there was Local Law 87, which requires an energy audit and retro-commissioning report to be conducted and filed every 10 years. Yes, it still applies, and yes it will help you to understand the most cost-effective retrofits and upgrades to target for compliance with the city’s new energy efficiency requirements. Thanks for asking!

The question we get most this time of year from owners in NYC is, “My building is due for LL87 compliance this year, is it too late to start?!”

Image of Commercial BuildingsAs spring arrives, building owners often realize that time is quickly running out and this is the year that they must submit their building. Compliance with NYC’s LL87 (Local Law 87) can be overwhelming and hard to navigate but we are here to help.

Not sure if you have to file?  Check here.

LL87 requires that a building undergo an energy audit and retro-commissioning of major mechanical equipment. Keep in mind that it takes time to perform the inspections and testing. In fact, your best bet is to start in the year before your deadline, leaving yourself plenty of time for planning, budgeting, and implementing any corrections that may be required.

(more…)

What Does NYC’s Climate Mobilization Act Mean for Building Owners?

Image of Existing Buildings in NYC

On April 18th, Introduction 1253-2018 was approved by the New York City Council along with several other major pieces of legislation as part of a Climate Mobilization Act. The Urban Green Council describes it as “arguably the most disruptive in our lifetime of the NYC real estate industry.” We agree. While it will take some time to more precisely gauge impact across the industry, here is an initial primer.

Update: On May 18th Intro 1253 was passed into law as Local Law 97 of 2019.

Context

Previous building energy legislation in NYC has focused primarily on providing the market with access to information in the form of benchmarking and audits. In response to increasing demands for more urgent climate action, this new local law will actually require energy performance levels – and significant retrofits in some cases – in most existing buildings over 25,000 square feet between now and 2030 and deeper reductions beyond 2030.

How Does Local Law 97 Work?

The law establishes targets for carbon-emissions intensity per square foot for buildings based on occupancy class. For instance, multifamily buildings, office buildings, schools, and storage facilities will have different intensity targets. Mixed-use buildings will have their targets set based on a weighted average of their different spaces. Across all segments, these targets will get ratcheted down over time. Building on the type of data submitted as part of annual benchmarking, all tenant and owner energy used at a particular building will be converted to carbon intensity per square foot.

Starting in 2024, buildings will be fined on an annual basis for carbon footprint that exceeds their targets. Based on their performance today, approximately 20% of buildings exceed the 2024 – 2029 targets while approximately 75% of buildings exceed the 2030 – 2034 targets, according to the City Council’s press release. As an alternative to this performance-based framework, rent regulated multifamily buildings with at least one rent stabilized apartment will be required to implement a prescriptive list of upgrades by 2024. These upgrades include indoor temperature sensors providing feedback to boilers and apartment thermostatic controls.

What Will It Mean to the Market?

(more…)

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.