MENU

Projects

Phillips Exeter Academy – LEED Gold Certified Field House

Market: Commercial - Education
Type: Secondary School
Location: Exeter, NH
Developer/Owner: Phillips Exeter Academy
Architect: Architectural Resources Cambridge
Building Size: 88,000 sf
Project Services: Sustainability Consulting, Energy Modeling
Certification: LEED® for New Construction™ Gold
Primary Energy Conservation Measures:: Solar PV panels on Roof.
High Performance HVAC Systems.
LED Lighting.
High Efficiency Glazing

Project Background:

The William Boyce Field House at the Phillips Exeter Academy in Exeter, New Hampshire achieved Gold certification under the US Green Building Council’s (USGBC) LEEDv3 NC rating system. The project building replaced the existing Thompson Cage building to provide an indoor space for a wide range of indoor athletic activities, including a 74,000 sf. space on the first floor for a 200 – meter running track and 12000 sf. space for a wrestling room and function areas on mezzanine floors. The project team was encouraged to be flexible and creative to develop beautiful and functional and regenerative landscapes surrounding the project.

Project Services:

As sustainability and energy consultants, Steven Winter Associates, Inc. (SWA) led early design planning meetings to identify high performing design elements, industry standards, and a roadmap to achieve the Exeter South Campus sustainability goals. Through design, SWA analyzed whole-building energy measures and energy use targets in addition to administrating the LEED certification program.

 

Primary Energy Conservation Features:

  • Rooftop solar provides 74% of the electric demand of the building offsetting 45% of the energy cost.
  • Site improvements around the new Field House enhanced pedestrian access and safety with new walks, improved lighting and bike storage—reducing the demand for automobile use and promoting human heath.
  • Underground parking for 169 cars helps minimize the hardscape areas on site and increase the landscape areas to create habitat and promote biodiversity.
  • The design and construction team reduced the embodied carbon footprint of the building through material reuse and selecting regional and recycled materials where possible.
  • The building also installed water efficient plumbing fixtures and LED lighting fixtures throughout the building to reduce its water and energy demand.

Awards:

Learn More About Our Commercial New Construction Services Here

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.